PUMP TRACK STARIC – CZECH REPUBLIC
COMPLETED: NOVEMBER 2016
SITE AREA: 800 m2
The first project completed by BT Project abroad. Covered with asphalt, the tracks forms part of the sports zone belonging to Static Municipality. Apart from the track itself (total length 115 meters), the project included the introduction of a rest area covered with paving stone along with small architecture facilities: a bicycle rack, an information board, a bench and trash bins.